The pneumatic transport of dust-laden bypass air is a technically demanding system, where even small design errors can lead to pipeline blockage, equipment damage, or safety risks. With the rise of the circular economy, the industry is increasingly handling materials with properties that differ significantly from traditional raw materials. This places new demands on old pneumatic transport systems that may not be able to meet them. In this guide, we will walk through how the pneumatic transport of dust-laden bypass air can be modernized step by step.
If you are considering upgrading your pneumatic conveying system, first familiarize yourself with to pneumatic conveying solutions and assess to what extent your current system needs an update.
Assessment of the starting situation before modernization
Carefully assess the current system before taking any action. The initial situation assessment is the step where we determine why the current solution is no longer functioning well enough and what modernization is needed. Without this information, it is impossible to choose the right equipment or properly size the new system.
The system collects the following basic information:
- Properties of the material to be transported: bulk size, density, moisture content, temperature and flammability
- Diameter, length and geometry of the current pipeline (corridors, height differences)
- Operating pressure and air flow
- Problems observed: blockages, wear, dust leaks, or capacity shortages
- Process capacity requirements now and in the future
Dusty side flows are particularly challenging because fine-grained material behaves differently than coarse-grained material. For example, metallurgical dust or fine-grained aggregate material can accumulate in the piping if the gas velocity or pressure settings are not correct. Therefore, the true behavior of the material must be understood before sizing, not after. In unclear cases, material testing in a test facility is recommended before final design decisions.
Also check the age of the system and the condition of the components. In an old system, valves, piping connections, and filters may have become worn in a way that affects the success of the entire modernization. Document the findings clearly, as they guide all subsequent steps.
Choosing the right transfer method and equipment
Choose the transport method and equipment based on the material properties and process requirements. This is the most important technical decision in modernization, because the wrong method leads to either repeated problems or unnecessarily high operating costs.
In pneumatic transportation, two methods are mainly used:
- Leaching (dilute phase): The material flows through the pipeline at a high gas velocity. Suitable for lightweight and easily flowing materials as well as for short transfer distances. It is simple to implement, but consumes more energy and causes more material wear.
- Flow cytometry (dense phase): The material flows through the pipeline at a low gas velocity in large bubbles. Suitable for sensitive, consumer-grade or heavier materials, as well as longer transfer distances. Significantly reduces pipe wear and material degradation.
For dust-laden side flows, pipelining is usually the better choice because the low material velocity reduces dust formation in the pipeline and minimizes wear. In particular, pulse pipelining is an energy-efficient option, as it uses less compressed air than jetting. However, the choice should always be justified by the material’s actual characteristics, not just by general principles.
When selecting the equipment, the following factors are taken into account:
- The volume of the pressure vessel relative to the required capacity (tonnes per hour)
- The material’s temperature and corrosion properties that affect material choices (carbon steel, wear-resistant steel, or stainless steel)
- The need for ATEX requirements when handling explosive dusts
- Compatibility of feeding devices, separators and filters with the new system
- Integration with an existing process control system (DCS)
Once you have chosen the method and equipment, make sure that the sizing is correct. A poorly sized system will clog up, while an over-sized system will consume unnecessary energy. Contact us to experts if you need support in sizing or choosing a method.
Implementation and introduction of modernization
Implement modernization as a phased process, where each step is reviewed before moving on to the next. Careful implementation reduces the risks of deployment and ensures that the system operates as planned from the very beginning.
Follow this order in the implementation:
- Unpacking and pre-preparation: Stop the process in a controlled manner and drain the piping system. Document the current piping geometry before dismantling.
- Renovation or modification of the plumbing system: Check whether the existing piping can be used or whether a new one is needed. With abrasive materials, bends are particularly critical, as they wear out quickly. Consider bends made of wear-resistant steel or special wear protection.
- Installation of equipment: Install the pressure vessel, valves, fluidizing system, and control unit according to the plans. Carefully check the seals and connections to prevent dust leakage.
- Installation of filters and separators: Make sure that your receiving hopper and the hopper filter are sized correctly. An undersized filter will quickly overload with dusty materials.
- Configuration of the control system: The parameter control unit is adjusted according to the material and the transport method. Set the pressure, cycle times, and alarm limits correctly.
- Trial use without material: First, run the system with the empty tank and check the tightness, pressure levels, and operation of the automation.
- Trial use of the material: Start with a small capacity and monitor the pressure in the pipeline, the flow of material, and any potential blockages. Adjust the parameters as needed.
During commissioning, it is normal to have to fine-tune the parameters. Dusty materials can behave differently under test conditions, so monitor the system closely during the first few hours of operation. Write down all observed deviations and any adjustments made, as this is valuable information for future system development. You can learn more to our references and see how similar projects have been implemented in practice.
Maintaining operational reliability after modernization
Ensure the system’s operational reliability through proactive maintenance and regular monitoring. An upgraded system only works well if its condition is checked systematically. Polluted by-pass flows consume equipment more than ordinary materials, so maintenance intervals must be adjusted accordingly.
Create a maintenance program that covers at least the following items:
- Checking the valves and replacing the seals at regular intervals
- Monitoring pipe joint wear, especially on dusty materials
- Cleaning and replacement of the filter elements based on the pressure difference in the filter
- Checking the operation of the fluidizing components
- Calibration of pressure meters and sensors
Monitor the system’s performance using the process data. Changes in print levels, increased cycle times, or a decrease in capacity are signs that a component needs attention. Early intervention prevents unplanned downtime and significantly extends the lifespan of equipment.
The by-products of the circular economy often change over time, so it is always worth checking the system’s suitability when the material under consideration changes. New material may require adjustment of parameters or even hardware upgrades. Kopar offers lifecycle services that support the reliable operation of the system throughout its entire lifespan. Explore our pneumatic conveying solutions or Get in touch, Therefore, we help assess the current state of your system and find the right measures to improve it.
Further information about the transport of fine-grained materials can also be found in the article what is the best pneumatic conveyor for fine materials.

You have a challenge that needs solving?